Bike Trail Maintenance Crew - Summer 2026
Big White Ski Resort Voir toutes les offres
- Kelowna, BC
- 20,50 $ par heure
- Permanent
- Temps-plein
- Remove and clear trees and other debris from bike trails.
- Construct and maintain wooden features within bike park.
- Construct new trails and/or features as directed by bike park management.
- Build water diversion structures and maintain existing drainages.
- Repair damaged bike trails due to erosion and rider use.
- Operate gas powered equipment including, but not limited to; brush saws, pole saws, string trimmers and plate tampers.
- Passion and interest in mountain biking.
- Knowledge of trail building techniques desired.
- Self-motivated.
- Ability to interact and communicate courteously with guests, coworkers and management.
- Ability to work with basic hand tools, such as shovels, rakes, pulaski and mcLeod.
- Non-biased, tolerant, and objective.
- Disciplined, responsible, and accountable.
- Ability to work with battery powered tools.
- Ability to be flexible.
- Ability to ride a mountain bike.
- Previous trail maintenance and/or building experience considered an asset.
- Experience operating heavy equipment such as skid steer, back-hoe, mini-excavator, four-wheeler considered an asset
- Experience with chainsaw and Sawyer techniques considered an asset
- Experience with carpentry and battery powered tools(drills, circular saw etc) considered an asset.
- Outdoor work in a mountain environment with variable weather conditions.
- Extended time outdoors with heavy lifting tasks.
- Heavy Lifting, must be able to lift and carry heavy loads up to 50lbs
- Raking, Shoveling, operating equipment.
- Bending, Walking, Lifting, Pushing, Standing for extended periods of time.
Big White Bike Park, British ColumbiaPosition duration:
Early June to Late September(weather dependent)Salary:
Training and starting wage - $20.50/hr